Design and construction of galvanic anode for steel pipe piles in brackish water
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    依托安哥拉LNG码头钢管桩牺牲阳极阴极保护工程,重点介绍在咸淡水环境下牺牲阳极阴极保护的设计、施工与验收,并介绍该工程浅水区引桥钢管桩牺牲阳极的实施。为咸淡水和浅水区的特殊环境下牺牲阳极阴极保护的实施与验收提供了重要依据。

    Abstract:

    Based on the galvanic anode cathodic protection engineering of steel pipe piles in Angola LNG terminal,this paper introduces the design,construction and acceptance method for the galvanic anode cathodic protection system of steel pipe piles in the brackish water and shallow water environments,which provides an important experience and basis for the implementation and acceptance method of galvanic anode cathodic protection system in special environments,just like brackish water and shallow water.

    参考文献
    相似文献
    引证文献
引用本文

陈 龙,李海洪,潘 峻.咸淡水钢管桩牺牲阳极设计与施工[J].水运工程,2015(3):128-131.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-03-20
  • 出版日期:
文章二维码