    摘要:

    蔺家坝船闸位于京杭运河苏北段的湖西航道上,为了满足货运量的增长需求,须建设复线船闸。本文对复线船闸的闸位布置进行了研究;从共用引航道宽度、复线船闸的引航道布置、施工条件、一线船闸闸室的主体结构、现场地形条件等方面,对可能的平面布置方案进行比较分析。经过综合论证,确定复线船闸与一线船闸的轴线间距为70 m。最后,为完善工程设计,对本工程提出了优化方向。

    Abstract:

    Linjiaba hydro junction is located at the west waterway on Beijing—Hangzhou Grand Canal in north Jiangsu.In order to meet the demand of cargo forecasts,it’s necessary to construct the second line ship lock.The general layout of the second line ship lock is researched,including the width of sharing approach channel,the type of approach channel of the second line ship lock,the construction condition,the chamber structure of the first line ship lock,the site’s topographic condition,etc.Different distances between axes of the first line and the second line are discussed and a distance of 70 m between axes of the two locks is determined according to general demonstration.At last,some optimized suggestions are presented to improve the design.

    参考文献
    相似文献
    引证文献
引用本文

韩巍巍,汤建宏,张黎明.蔺家坝复线船闸闸位布置研究[J].水运工程,2014(4):133-137.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-04-16
  • 出版日期:
文章二维码