长江口深水航道治理工程疏浚土扩散研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Diffusion extension of dredging material in the improvement project of Deep-water Channel of the Yangtze estuary
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长江口深水航道治理三期工程疏浚工程建设过程中,组织6艘装备ADCP的水文测验船,在国内首次采用多固定断面法对耙吸作业过程的溢流疏浚土及北槽内贮泥坑、抛泥区涨落潮抛泥过程中的疏浚土扩散情况进行了观测。首次在长江口成功获取了水体中疏浚土扩散场的实测资料,深化了对长江口疏浚土扩散特性的认识,在此基础上,改进了疏浚溢流和疏浚土处理的时间控制措施。

    Abstract:

    During the construction of the third stage of Improvement Project of Deep-water Channel of the Yangtze estuary, 6 ADCP hydrologic survey vessels were arranged to measure the diffusion condition of the suspended sediment via fixed synchronous cross section measurements, which was carried out in China for the first time. The result of suspended sediment diffusion field was observed when the dredged sediment was overflowed during dredging in channel and deposited in the disposal area in the north passage of the Yangtze Estuary during the tidal fluctuation period. According to that, the optimized construction method was improved.

    参考文献
    相似文献
    引证文献
引用本文

冯 俊.长江口深水航道治理工程疏浚土扩散研究[J].水运工程,2013(S1):92-97.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-02-01
  • 出版日期:
文章二维码