高强度超载预压联合强夯软基处理技术现场试验研究*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

江苏省建设厅基金项目(JS2008ZD03)


Field test on high-strength overload preloading combined dynamic compaction for soft foundation treatment technology
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    江苏金港湾国际物流园区建于连云港市沿海的深层软土上。“8 m高强度超载预压联合强夯”方案被首次采用对B型集装箱堆场进行软基处理,并获得成功,大大突破了本地区以往的超载预压高度。该工程案例不仅为连云港市的高强度软基处理提供了成熟经验,而且证明了高强度软基处理具有可行性和可操作性,对在沿海软土上修建港区具有良好的借鉴作用。

    Abstract:

    Jiangsu Jingangwan international logistics park is constructed in Lianyungang coastal deep soft soil, “8 m high-strength overload preloading combined dynamic compaction” scheme is first used successfully on container yard B for soft foundation treatment, which broke through significantly the overloading prepressing height in the local area before. The engineering case not only serves successful experience for the high-strength soft foundation treatment in Lianyungang city, but also verifies the feasibility of the high- strength soft foundation treatment. It may serve as reference for the construction of port area on coastal soft soil ground.

    参考文献
    相似文献
    引证文献
引用本文

张永宏,王 挺,高公略,等.高强度超载预压联合强夯软基处理技术现场试验研究*[J].水运工程,2013(5):162-167.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-05-17
  • 出版日期:
文章二维码