    摘要:

    东营某新建油品码头距后方库区约20 km,船泵扬程不足以克服沿程摩阻将物料直接输送至库区。通过分析与计算,提出码头上设置加压泵站的方案,充分利用码头平台空间。在此基础上,对管道进行水击分析,检验瞬时水击压力是否超过管道设计压力,并对超压工况提出调整方案。

    Abstract:

    As the new terminal in Dongying is just 20km away from the tank farm, the ship pump head is not enough to overcome the frictional resistance, so the materials can’t be directly transported to the tank farm. After analysis and computation, we raise a proposal of installing a pump station on the terminal, so as to make good use of the space on the terminal platform. Furthermore, we carry out a water hammer analysis to test whether transient water hammer pressure exceeds the designed pressure of pipe, and adjust the proposal to decrease transient water hammer pressure if it is higher.

    参考文献
    相似文献
    引证文献
引用本文

王 涛.长引桥码头加压泵设置及管道水击分析[J].水运工程,2013(5):84-87.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-05-17
  • 出版日期:
文章二维码