大连港矿石专用码头泊位升级改造工程护舷悬挑钢架结构创新设计
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Innovation design of steel frame for overhanging cone fender in Dalian port specialized ore terminal berth upgrading reconstruction project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍大连港矿石专用码头泊位升级改造工程护舷改造钢架结构的设计情况,在国内码头升级改造工程中该结构尚属首例。根据护舷钢架的受力特点,比较了两个护舷钢架的设计方案后,最后选用了放射竖板加顶底板的方案。详细 介绍了护舷改造钢架的设计分析方法,同时介绍了在安装过程中出现的问题和解决方案。

    Abstract:

    This paper introduces the design of steel frame for overhanging cone fender in Dalian port specialized ore terminal berth reconstruction project. In domestic port upgrading project, this structure is still the first utilized. According to the mechanical characteristics of steel frame for fender, we compared the two design schemes of steel frame for fender, and chose the radiation vertical board and top floor plan. The design method of steel frame for fender problems with solutions in installation process are also presented.

    参考文献
    相似文献
    引证文献
引用本文

王安华,朱圣文,胡家顺.大连港矿石专用码头泊位升级改造工程护舷悬挑钢架结构创新设计[J].水运工程,2012(8):72-76.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-08-22
  • 出版日期:
文章二维码