Abstract:Engineering practice has proved that the super-long pile with axial loads in soft soil area is quite different from the conventional pile foundation in load transfer mechanism. Through static load and pile shaft force test of super-long pile in deep soft soil area, proper pile length estimation formula of super-long pile is deduced according the load-settlement deformation relationship. Using Q-S curve static load test data, the proper pile length of super-long pile is calculated.