悬索桥锚碇基础地下连续墙施工工艺及质量控制措施
DOI:
CSTR:
作者:
作者单位:

中交第二航务工程局有限公司,湖北武汉430040

作者简介:

通讯作者:

中图分类号:

基金项目:


Technology and quality control measures of diaphragm wall of suspension bridge anchorage foundation
Author:
Affiliation:

CCCC Second Harbor Engineering Co., Ltd., Wuhan 430040, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    地下连续墙最初应用于水利工程,后又推广到高层建筑基础和地铁等地下工程中,随着新型设备和施工工艺的不断创新,近年来国内几座大型悬索桥锚碇基础也纷纷采用地下连续墙作为围护结构。结合国内几座大型悬索桥工程实例,对锚碇基础地下连续墙的施工工艺进行介绍和分析,并从技术和管理角度阐述其质量控制措施。

    Abstract:

    The diaphragm wall was originally used in the hydraulic engineering, and later extended to other high-rise building foundation and underground Metro, with the new equipment and construction process of continuous innovation. In recent years, several large-scale suspension bridges adopted diaphragm walls as the supports. Combing with the practice of several large suspension bridge engineering, this paper describes the construction technology of the diaphragm wall and based on the anchorage underground continuous wall construction techniques are introduced and analyzed, and from the perspective of its technology and management quality control measures.

    参考文献
    相似文献
    引证文献
引用本文

陈若强.悬索桥锚碇基础地下连续墙施工工艺及质量控制措施[J].水运工程,2011(04):159-165.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-05-28
  • 出版日期:
文章二维码