    • >Engineering Management
    • Application of BIM technology in design optimization and management in Qianwei navigation-power junction

      2021(12):1-7.

      Abstract (757) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Navigation and power junction projects generally have the characteristics such as large project investment,long construction period,complex construction environment and difficult coordination. Under the traditional management mode,the project is difficult to achieve refined management,there are a series of problems in the construction process,such as poor information communication and personnel coordination,difficulty in engineering measurement visa and schedule control. We analyze the application of BIM technology in design optimization and management in Qianwei navigation-power junction,and explore the refined management mode based on BIM technology. The results show that through the application of BIM technology during a total of life cycle in Qianwei navigation-power junction,it improves the design quality in the survey and design stage,realizes the auxiliary project management in all aspects of quality,progress,cost and safety in the construction stage,and finally realizes the cost reduction and efficiency increase of the project.

    • Investment cost control of Qianwei navigation-power junction project in the Minjiang River

      2021(12):8-10.

      Abstract (578) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The navigation and power junction project generally faces some problems such as large investment,strong public welfare and poor economic benefits. In order to improve the economic benefits of the project,the owner unit must strictly control the investment cost of the project from all angles to achieve the purpose of reducing costs and increasing efficiency. We take Qianwei navigation and power junction in the Minjiang River comprehensive development project as an example,start from the four aspects of engineering design optimization,contract management,fund management and tax planning,expound in detail the main measures taken by the project to control the investment cost of the project and the effects. The results show that every management mean plays an important role in the process of project investment cost control,which can lay a solid foundation for the good operation.

    • Application of BIM technology in construction supervision of Qianwei ship lock project

      2021(12):11-13.

      Abstract (495) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the application value and application path of BIM technology in ship lock engineering construction supervision management control,taking Qianwei ship lock engineering of the Minjiang Qianwei navigation-power junction project as the study case,we adopt the literature research,observation,and empirical research methods to probe into the management control function of ship lock engineering construction supervision and the application path of BIM technology in ship lock engineering construction supervision management control. The results prove that BIM technology can be better used for management control in the construction supervision of ship lock engineering,and has high promotion value.

    • Safety supervision measures for construction of Qianwei ship lock project

      2021(12):14-17.

      Abstract (454) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Project safety management has always been the key and difficult point in the whole project implementation process. With the development of the times and the frequent occurrence of various safety accidents,more and more people pay attention to the importance of safety and are eager to ensure their own safety in production and life. This paper discusses the safety supervision measures during construction through the joint higher qualified supervision unit,selection of professional supervisors,strengthening the training of management personnel,as well as scientific management means to raise awareness of safety and protection of all participants and curb the occurrence of safety accidents from the root,to ensure the safe and smooth implementation of the construction project.

    • Discussion on construction supervision method of Qianwei ship lock project

      2021(12):18-20.

      Abstract (345) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:As a large-scale project,lock construction is more complicated compared with other water transport projects,and problems easily occur,the construction technology requirements are higher,so construction supervision is very important. Ship lock construction supervision has important significance to ensure the quality,progress and safety of the project,which can effectively eliminate all aspects of hidden dangers for the construction,and ensure the smooth and efficient implementation of the ship lock construction project. This paper summarizes the experience from lock construction supervision practice,and puts forward construction supervision scheme from the control of quality,progress,safety,etc.,which may serve as reference for similar projects.

    • >Pivotal Design
    • Hydraulic characteristics of unsteady flow of reverse arc-gate corridor for water conveyance of Qianwei ship lock

      2021(12):21-27.

      Abstract (533) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The dynamic water load in the discharge valve section of a ship lock is a key technical problem in the design of a high head ship lock. Based on the unsteady flow atmospheric pressure model test of the“flat bottom & expanding top”corridor of the back arc-gate of Qianwei ship lock,we emphatically study the characteristics of hydrodynamic pressure and hoisting force in valve section,hydro-dynamic load in the corridor of valve section under the condition of hydro-dynamic closing,the influence of opening rate and acting head on hydro-dynamic load and hoisting force. The results show that considering the structural system of valve,dynamic water load behind the door,characteristics of opening and closing force,air defense effect,the valve of Qianwei ship lock will not cause harmful flow-induced vibration.

    • Layout of filling and emptying system of Qianwei ship lock

      2021(12):28-32.

      Abstract (469) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Qianwei ship lock is an important joint project of Minjiang high-grade waterway,and its effective scale is 220 m× 34 m × 4.5 m(length×width×water depth on sill),design head is 19 m. Combining with the general layout of the project and in accordance with the requirements of the specification,we determine the decentralized water conveyance system form of lock wall long corridor and branch corridor at the bottom of the lock in Qianwei ship lock,and verify by the hydraulic calculation and model test. The results show that the layout of the water conveyance system and the opening mode of the valves are reasonable. The berthing conditions of the lock chamber and the flow conditions of the upstream and downstream water inlets and outlets are good,which can meet the requirements of the flow conditions and the safe operation of the water conveyance system,and achieve the expected goal.

    • Navigation conditions of ship lock under dry season during construction of Qianwei junction

      2021(12):33-37.

      Abstract (384) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The Qianwei navigation and hydropower project of the Minjiang River is the third of the four cascades in the recent channelization of the Leyi section of the Minjiang River. It plays an important role in the development of Minjiang shipping and river basin economy. In order to ensure the safety of ships passing the lock during the dry season period,we apply the actual ship test to determine the navigable current conditionsof the upper and lower approach channels of the ship lock navigable current conditions and ship navigation posture and other relevant parameters,analyze the feasibility and safety of navigable locks during the dry season period.The results show that the ship can basically enter and exit the ship lock safely,there is no bad flow state of the shi plock’s filling and discharging water,and the ship’s mooring force meets the requirements. However,the sloped current in the downstream entrance area of shiplock is large,so the ship should be steered cautiously,and the navigation should be suspended if necessary.

    • Cause analysis of sediment deposition in lower approach channel and entrance area of Qianwei ship lock during initial impoundment period

      2021(12):38-42.

      Abstract (376) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The navigation problem of the ship lock is very important,but the serious sediment deposition will lead to the insufficient navigation depth of the channel and affect the navigation. In view of the problem of sediment deposition in the lower approach channel and entrance area of Qianwei ship lock,we use two-dimensional sediment model for numerical simulation,analyze the causes of sediment deposition,put forward and verify the measures of improving the channel sedimentation. The results show that affected the downstream riverbed topography and the boundary conditions of approach channel and entrance area,a wide range of backflow is formed,and the sediment deposition range and thickness are large. The sediment deposition is significantly reduced after taking the improvement measures.

    • Natural-like fishway design of Minjiang Qianwei navigation-power junction

      2021(12):43-46.

      Abstract (557) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:In order to determine the basic parameters of the natural-like fishway design of Minjiang Qianwei navigation-power junction and the rationality of the fishway layout,the swimming ability of the fish caught in the surrounding rivers is tested on the spot,the flow conditions in entrance and exit of fishway are verified by the hydrodynamic calculation of the two-dimensional mathematical simulation model,and the hydraulic characteristics of the natrual-like fishway are researched by physical model. The design plan is proposed:1)The fishway design level should be determined by the combination of guarantee rate of flow and the level of power generation.2)The nature-like fishway is arranged on the stockpile body on the left side of the power plant. The fishway and its transversal partitions are all made of gabions,and water supplement measures are arranged at the entrance of the fishway.The experimental results show that the designed velocity of Qianwei fishway is no more than 1.20 m/s,and the velocity distribution of each chamber in the fishway is diversified,which meets the hydraulic conditions of the fish.

    • Application of geo-membrane in anti-seepage of fishway

      2021(12):47-49.

      Abstract (579) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the anti-seepage design for the fishway structure arranged on the slag pile platform,we study the anti-seepage forms for various hydraulic structures in water conservancy project. Based on the comparative analysis of the anti-seepage form of similar projects,we conclude that the anti-seepage material suitable for this project is the anti-seepage geo-membrane,the excellent elasticity and deformability of which make it very suitable for the expansion or contraction base,and which can effectively overcome the uneven settlement of the base surface. It is also has the advantages of good seepage prevention effect,convenient construction,lower project costand shorter project period. Summarizing technical characteristics and construction precautions of geo-membrane,we hope to provide reference for similar projects.

    • Overall layout of Qianwei navigation-power junction

      2021(12):50-53.

      Abstract (324) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Qianwei navigation-power junction is located in the middle and lower reaches of Minjiang River,in the hinterland of Sichuan Province with densely populated surrounding areas and a long history. This article introduces how to consider the topography,geological conditions and the impact of the junction construction on the surrounding humanistic environment in the overall layout of the Qianwei navigation-power junction project,so that the various hydraulic buildings with different functions can be coordinated with each other and give full play to their functions,as well form a unique project.

    • Scheme comparison and implementation of Minjiang Qianwei navigation-power junction phase III cofferdam

      2021(12):54-59.

      Abstract (416) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the applicability of steel sheet pile cofferdam and earth rock cofferdam in specific environment and conditions,combined with the engineering boundary conditions,we study the applicability of cofferdam scheme,convenience of material source,engineering quality risk,construction period and construction cost. Based on comparison,we come to the conclusion that under the working conditions of tight construction period,high quality requirements and large upstream water head difference,the earth rock cofferdam has the advantages of better anti-seepage effect and lower cost,and is more suitable for the phase III cofferdam project of Qianwei navigation-power junction in Minjiang River. Based on the research and engineering practice,the key and difficult points of earth rock cofferdam construction and the technical measures and results are put forward,which may serve as reference for similar projects.

    • Design of powerhouse for the bulb tubular turbine of Qianwei navigation-power junction project in Minjiang River

      2021(12):60-64.

      Abstract (344) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:According to the characteristics of bulb-type tubular unit,the powerhouse overall stability and structural stress have been respectively analyzed by using the material mechanics method and three-dimensional finite element method. Reasonable layout and structure design have been carried out for the powerhouse by properly setting the locations of water-stops between joints,as well as the foundation treatment.The satisfactory results are obtained for the powerhouse design,and the overall layout and structural design of powerhouse are reasonable,safe and economical.

    • Application of prefabricated road in Qianwei navigation-power junction project

      2021(12):65-68.

      Abstract (295) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the problems of frequent demolition and construction of temporary construction roads in different construction periods and high construction economic cost and time cost in the process of hub project construction,the prefabricated road construction technology is researched. The application of this technology in the Qianwei navigation-power junction project has reduced the economic cost and time cost of construction,and gained time for the construction of the main project. It is concluded that the application of prefabricated road construction technology can effectively reduce the construction cost of temporary construction road.

    • >Survey and Constructio
    • Flood control engineering practice of ship lock wall during construction in Qianwei navigation-power junction

      2021(12):69-72.

      Abstract (430) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The Minjiang Qianwei navigation-power junction adopts the construction diversion scheme of three phases and six sections to ensure continuous navigation during the construction period. In view of the problems of tight schedule and safe flood control risk in the third phase of the project,we propose to use the left lock wall to block the water and control the flood control during the diversion construction of the second phase cofferdam,and to demolish part of the second phase longitudinal cofferdam in advance under dry land condition. The results show that in the construction process of large ship lock in mountainous rivers,the use of the gate wall to hold back water and control the flood season can reduce the amount of underwater weir removal,improve the quality of longitudinal cofferdam removal,shorten the demolition period of the cofferdam,which has the significant economic and social benefits.

    • Construction technology of imitating ecological fishway

      2021(12):73-78.

      Abstract (716) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the problems existing in the construction of ecological fishway in Qianwei Navigation-Hydropower Junction,such as great disturbance in channel slope excavation,difficulty in ensuring the compactness,difficulty in connecting the anti-seepage geomembrane of the channel,irregular changes in the route of ecological fishway,and tedious work in slope excavation survey and setting-out,the construction technology of ecological fishway was studied. Firstly,the feasibility of the design scheme of imitating ecological fishway in Qianwei Navigation and Hydropower Junction was verified by fishway model test and fish ecology test. Then,combined with the characteristics of imitating ecological fishway,the fishway channel shape,fishway flexible seepage control and fishway slope rolling were studied to ensure the fishway construction quality and fishway structure stability. This paper analyzes the flow pattern of fishway pond chamber and the maximum flow velocity of fish passing control section,puts forward the influence of fishway curve and diaphragm permeability on flow velocity,and reasonably sets up the rest pond to ensure the target fish to pass through fishway smoothly. Using local natural building materials,the natural migration channel of fish is constructed,which conforms to the ecological principle and meets the requirements of ecological protection.

    • Construction technology of underwater rapid blocking in specific conditions

      2021(12):79-83.

      Abstract (514) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the submergence of the foundation pit of the power plant,the underwater blocking research is carried out. The Minjiang Qianwei navigation-power junction adopts the blocking scheme of“underwater operation + temporary blocking body + back support + flat pressure device”,which overcomes many problems such as limited working space,short construction period,high difficulty,and prominent safety hazards. It takes 9 days to successfully block the traffic corridor to ensure the progress and safety of the project. This result has filled the research gaps in this field,laid the foundation for research,and formed an invention patent at the same time.

    • Identify of reflect false anomaly of steel bar in concrete by ultrasonic S-wave 3D imaging technology

      2021(12):84-88.

      Abstract (384) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:In order to solve the problem that the false anomaly generated by the reflection of reinforcement in the nondestructive testing of concrete defects interferes with the diagnosis and discrimination of defects,we carry out an experimental study on the reflection and defect of reinforcement in precast beam concrete. We discuss the influence of the steel bar distributed in different directions on the ultrasonic S-wave 3D imaging test results,establish the suspected defect group and the control group,and apply the ultrasonic method for comparison and verification,and obtain the false abnormal characteristics of the reflection of vertical and oblique steel bar. The results show that the false anomaly generated by the vertical distribution of steel bars is easy to identify,while the false anomaly generated by the oblique distribution of steel bar has a higher similarity with the true anomaly generated by the effective reflection wave from the defect,and produces a greater interference to the anomaly identification. Data interpretation should be combined with design drawings to strengthen identification,so as to avoid misjudgment.

    • Safety monitoring and construction of Qianwei ship lock

      2021(12):89-93.

      Abstract (553) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the safety problems of large entrance ship lock during construction,based on Qianwei ship lock of the Minjiang River,we monitor the settlement and displacement of the upper and lower approach channel,the upper and lower lock head and the lock chamber,the earth pressure behind the wall,the base pressure,the seepage pressure at the bottom of the wall,the stress and strain of concrete and steel in the key parts of the lock. The results show that the measured values of the earth pressure of the ship lock are mainly affected by the pouring of the upper concrete and the backfill earth pressure behind the wall. The measured values of each measuring point of the strain gauge group are mainly affected by the hydration heat of concrete at the initial stage,and are mainly affected by the pouring of surrounding concrete at the later stage. The measured values of each measuring point of the steel bar gauge are mainly affected by the construction stress change of the upper concrete. The pouring time of concrete should be reasonably arranged and the hydration heat of concrete should be controlled during the construction of ship lock.

    • Water retaining engineering measures during construction period of Qianwei ship lock gravity lock wall

      2021(12):94-98.

      Abstract (536) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The construction task of Qianwei navigation-power junction on Minjiang River is heavy and the time is short. In order to shorten the construction period,save the investment of cofferdam construction,and meet the overall schedule of the project and the navigation requirements during the construction period,it is necessary to remove the “second stage and second section cofferdams”,and use the gravity lock wall outside the ship lock to retain water during the flood season to continue construction. In view of the safety and stability of the structure when the external lock wall is used for water retaining in flood season,the paper puts forward the corresponding engineering measures by rechecking and calculating the structures of different water retaining parts,so as to meet the safety and stability of the structure,ensure the construction period of Qianwei ship lock,and save the project investment.

    • Application of crane ship in Qianwei ship lock maintenance

      2021(12):99-103.

      Abstract (314) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Aiming at the maintenance of large ship locks in mountainous rivers,the maintenance gates types and lifting equipment are compared from the aspects of investment cost-effectiveness,commonality,convenience,etc.,therefore,it is determined that the maintenance plan of Qianwei ship lock is“floating stacked beam maintenance door + crane ship”. The particularity of Qianwei ship lock maintenance is described in detail,and the research on the hoisting process of the crane ship in Qianwei ship lock maintenance is carried out. Through experience summary and boundary condition simulation methods,the key control elements of crane ship in hoisting super large floating stacked beam maintenance door are obtained. The article introduces in detail the application of crane ships in the lifting and maintenance of gates in large ship locks in mountainous rivers,which provides experience and reference for similar large ship locks.

    • Real-timeonline monitoring for water release gate of the Qianwei navigation-power junction

      2021(12):104-107.

      Abstract (515) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:In view of the special importance of hydraulic steel gates in hydraulic engineerings,the limitations of traditional detection and prototype observation are analyzed,and the necessity of real-time online monitoring is proposed. Taking Minjiang Qianwei navigation-power junction real-time online monitoring as an example,the overall structure of on-line monitoring system and the cable collection and release are designed,and the monitoring and sensor selection plan of the plane fixed-wheel gate are given. The system monitors structure stress,structural dynamic response,running attitude,and fixed-wheel running state.

    • Temperature control supervision measures in mass concrete construction of Qianwei ship lock

      2021(12):108-111.

      Abstract (458) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:In the mass concrete construction of ship locks,the temperature control measures are crucial to the stability of the whole concrete structure,so it is necessary to find a new temperature control method through supervision. Combining with Qianwei navigation power junction project in the Minjiang River,we expound the temperature control supervision measures in the mass concrete construction of the ship lock,including managing the concrete mixing ratio,strengthening the tracking observation,etc.,by which the construction quality of mass concrete is guaranteed. The construction experience of the project proves that the measures taken by the supervision organization effectively guarantee the construction quality of mass concrete,so it is feasible. Through flexible means of temperature control,the construction quality of ship lock mass concrete has been improved,which is worth learning from other projects.

    • Application of anti-seepage construction technology of high-pressure rotary jet grouting pile in earth-rock cofferdam

      2021(12):112-114.

      Abstract (388) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:To ensure the ability of retaining water and anti-seepage of earth-rock cofferdam and the construction quality and safety of the project,we adopt the high-pressure rotary jet grouting anti-seepage slab wall in the first section of the earth-rock cofferdam of Qianwei navigation-power junction project in the Minjiang River. According to the research,test and analysis on the construction technology of the double pipe method of the high-pressure jet grouting pile anti-seepage sheet wall,we determine the construction technology and optimal construction parameters. Furthermore,we analyze the advantages of the high-pressure jet grouting pile anti-seepage construction in the earth-rock cofferdam to provide reference for similar projects.

    • Application of low heat Portland cement in mass concrete of Qianwei ship lock

      2021(12):115-118.

      Abstract (570) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Temperature crack control is a key problem to be solved in the application of mass concrete. Structural crack will have a negative impact on the durability of concrete. In order to control the problem of mass concrete cracking,we pour the main hydraulic structures of Qianwei ship lock with the low heat cement concrete,and analyze the inspection results of physical samples,the temperature data collected on site and the actual effect of concrete. The results show that the hydration heat and the adiabatic temperature rise of concrete at each hydration age are lower than these of ordinary cement,which can effectively reduce the temperature stress of concrete and the risk of concrete cracking. The low heat Portland cement can be better used in the mass concrete of ship lock engineering to solve the problem of cracking.

    • Applicationof UAV airborne LiDAR measurement technology in Qianwei navigation-power junction

      2021(12):119-124.

      Abstract (366) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:UAV airborneLiDAR measurement technology is a high-tech surveying and mapping technology that takes UAV as a flying platform and integrates laser ranging,positioning,inertial navigation and photogrammetry functions into one,which can better realize the integration of survey and design. It is a full-day,efficient operation compared to traditional mapping,and has the advantage of overcoming the impact of vegetation cover to a greater extent,and is suitable for data collection in complex terrain areas such as high mountain valleys,and has received wide attention from the industry in recent years. Combined with the application of this technology in Qianwei navigation-power junction,we explore the value of its application with a view to better integration with project production in the future.

    • >Protection Engineering
    • Analysis on engineering properties of cement-sand-gravel

      2021(12):125-128.

      Abstract (396) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Cement-sand-gravel dam combines the advantages of low cost of earth rock dam and high safety of concrete dam,which can greatly improve the land utilization rate. In case of excessive flood,it will not break the dam and has a short recovery period,and the difficulty of rescue and disaster relief is greatly reduced. We summarize the advantages of current examples of cement-sand-gravel dam projects at home and abroad,simulate the diagenetic process of sand gravel by manually selecting cementitious materials and sand gravel for mixing,paving and rolling combining with the construction example of cement-sand-gravel dam project in the reservoir area of Qianwei navigation-power junction project in Minjiang River,test and analyze the engineering properties of synthetic cement-sand-gravel to determine the optimal mix proportion,and compare it with the engineering properties of natural calcium cemented cement-sand-gravel in Yele hydropower station. The results show that it is safe and feasible to use synthetic cement-sand-gravel to build dam,which can provide references for the similar projects.

    • Application of cementitious gravel dam on the foundation of deep overburden of sand and gravel

      2021(12):129-134.

      Abstract (416) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:At present,the cemented gravel dams of domestic and foreign engineering examples all use rock foundations as the foundation surface. There is no precedent for the construction of cemented gravel dams on the foundation of sandy gravel overburden. Combining the example of the flood control embankment project in the reservoir area of the Minjiang Qianwei navigation-power junction,this paper uses the material mechanics method and the finite element method to explore the design of cemented gravel dam on the sandy gravel foundation. The cross-section design,stability and stress analysis,dam structure design and anti-seepage design,etc. are carried out,and a foundation treatment plan for building a cemented gravel dam on the foundation of a deep sandy and gravel is proposed.

    • Application of cemented sand gravel material in anti-scour structure

      2021(12):135-138.

      Abstract (451) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:In the flood protection dike,the impact protection of the foot protection structure is very important. The durable foot protection structure with good protection effect can provide effective and reliable protection for the flood dike structure. In this paper,combined with Qianfengba dike project of Qianwei navigation power junction,a new type of cemented sand gravel material is introduced as a new anti-scour structural material. The applicability,durability and cost of different types of foot protection are compared and analyzed,the application of prefabricated tetrahedral toe protection of cemented sand gravel in dike engineering and river anti-scour structure is discussed.

    • Combination of Tangba cemented gravel embankment of Minjiang Qianwei navigation and power hub project with municipal greening

      2021(12):139-144.

      Abstract (633) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:The rigid flood bank such as the cemented gravel embankment is safer when facing excessive flood,and has smaller sections,with less land occupied,but the traditional cemented gravel embankment ignores the ecological function. By combining the ecological function with the cemented gravel embankment in the design of Tangba flood bank of Minjiang Qianwei navigation and power hub project,we propose the scheme considering both remarkable function and ecologic performance,and analyze the economic and social benefits of cemented gravel embankment’s soil and water conservation. The result shows that the cemented gravel embankment can combine the safety property with ecological functions in many ways,and achieve the effect of green ecology and beautiful landscape,reduce the amount of soil erosion on the reservoir bank to protect biodiversity,thus it is more suitable for the urban embankment.

    • Application of a new type of flood control wall in mountainous rivers

      2021(12):145-149.

      Abstract (319) HTML (0) PDF 0.00 Byte (0) Comment (0) Favorites

      Abstract:Due to the high water level caused by the cascade construction along the river or the low standard of the built embankment in the original city,the current levee standards often fail to meet the requirements of the specifications and need to be heightened. Taking the design of Huangqiba protection dike in Minjiang River as an example,this paper puts forward several new types of flood control wall structure,and compares and analyzes their advantages and disadvantages. According to the structural characteristics of different flood control walls,the applicability of the new type of flood control wall in mountainous rivers and urban embankments is demonstrated.

Monthly,founded in 1976

Competent Unit: China Communications Construction Company Ltd.
Sponsor Unit: CCCC Water Transportation Consultants Co., Ltd.
Editor in Chief:WU Peng
Edited, Published and Distributed by: Editorial Department of Port & Waterway Engineering
International Standard Serial Number:ISSN 1002-4972 Domestic Unified Serial Number:
CN 11-1871/U
Price: 25.00 yuan per copy
Submit
Metadata Retrieval