PENG Yu-sheng , DING Min , ZHANG Zhi-xia , LIU Jian , WANG Hai-xia
2016(10):13-17.
Abstract:The paper reviews the construction and operation of China coastal port during the 12th Five-year Plan and summarizes the stage characteristics of coastal port development.Considering China’s economic and social development situation,the overall development direction of the coastal port during the 13th Five-year Plan is analyzed and the throughput of 2020 is predicted. On this basis,the train of thought on development of China’s coastal port during the 13th Five-year Plan is proposed.
LIU Yong-man , XU Xue-jiao , ZHANG Bin
2016(10):18-21.
Abstract:Under the guidance of new development concept,we analyze the general rule of port-city development,discuss key matters to be considered in the integration of port master planning and city planning.we focus on key issues of the connection of port general planning and city planning,practice the key solutions combining the planning of Dalian port Taipingwan harbor area and Qinzhou port Dalanping harbor area,and propose the advice and suggestions on port-city planning.
XING Pei-xu , LIU Jun-sheng , CAI Wei
2016(10):22-27.
Abstract:The Middle-East EPC projects have the features of high integration of engineering,procurement & construction,strict contract concept,many engineering change orders and complicated engineering submission procedure,which is not only a great challenge to the domestic engineering enterprises but also a good opportunity for capability improvement and rapid internationalization.We briefly state the concept of EPC project,propose that the engineering should play a leading role and create value in EPC projects,discuss in detail the core and management control in all-lifecycle engineering,such as preparation,project bidding,project planning,project engineering,engineering submission and construction coordination,and explain it through a typical project case in the Middle-East,which hopefully would be the reference for future international EPC project engineering.
ZHU Shan-qing , WU Xiao-lei , LIU Jian , LIU Xiao-bin
2016(10):28-33.
Abstract:Under the background of“Multiple Plans Integration”,and based on the port economic theory,we demonstrate the relationship between the port economic zone planning which takes the coordinated development of the port,industry and city as the core and relevant planning,and explore the framework of port economic zone planning and key points.Combining with planning practice,we propose solutions for the technical problems such as the choice of port industries and spatial layout,resource evaluation and capacity analysis of port economic zone,as well as the coordination of multiple plans,etc.
ZHANG Peng , HUANG Wei , DUAN Chun-yan , QIAN Li-ming
2016(10):34-39.
Abstract:Large-scale reclamation project pre-planning is a systematic analysis and demonstration of many professional disciplines,including market demand,project approval,project construction,environmental protection,operation management,benefit evaluation,etc.Taking the large-scale reclamation project pre-planning in Chang’an new district of Dongguan as a study case,we consider first the actual needs of the project operation and analyze the management policy and approval process of the marine administrative department,and propose the planning idea and promoting means in the early-stage work of the whole process for the industrial planning,urban planning,project reporting,project approval,management mode and ecological coastal planning,etc.,summarize the experience of early-stage land reclamation engineering practice of Chang’an new district,and probe into integrated solutions for problems in the early-stage land reclamation engineering.
2016(10):40-45.
Abstract:The lack of actual measruement data of wind and ocean surface wave can seriously affect the quality and schedule of harbor development with the expansion of harbor construction to open water.Through the investigation and research on the data,observations,and models about meteorology and oceanography,based on observations and reanalysis data,integrating the mesoscale meteorological model,WRF,and the 3rd generation ocean wave model,WaveWatchⅢ(WWⅢ),a wind and ocean wave hindcast and simulation system comes into reality.It utilizes BS architecture and browser as human-computer interface.The models run in a mass parallel computer cluster,named calculation server,with LINUX and MPI as software environment.The model controlling from WWW server is implemented through a web service program which runs in calculation server,receiving instructions from WWW server and then run appropriate model accordingly.Large number of model instances are organized by firstly categorized as WRF and WWⅢ,and then graded into user,projection,model,type and application.This system can hindcast and simulate the wind field in any domain and simulate the ocean surface wave field in any ocean domain.The application of this system shows that this method and system can simulate the typhoon and its wave field correctly.
PAN Hai-tao , HE Zheng-bang , WEI Hong-tong
2016(10):46-49.
Abstract:The LNG fuelled ship,with its environmental-friendliness,energy saving and other advantages,has attracted attentions of more and more countries and shipping companies.In view of problems of the LNG fuelled ship in policies and regulations,LNG fuel supply and bunkering technology,we summarize the development trend of fuel bunkering technology of LNG fuelled ship at home and abroad.Based on the analysis of the bunkering methods for the LNG fuelled ship and the scale of the bunkering station,we propose suggestions and measures on development of the LNG fuelled ship’s application in China.
2016(10):50-56.
Abstract:There are two main reasons which make the serious mudding and pollution in Nantaiwu beach.Firstly,in front of Nantaiwu beach water area,the wave is small and the trend is weak;secondly,Jiulong river and coastal land sewage water have a direct and great impact on the beach.Facing with complex external boundary conditions,this study integrates coastal dynamics,ecology,environmental science and other disciplines,considering the needs of urban sewage drainage and landscaping,then analyzes the current situation and mechanism of mudding.From technical,economic and ecological views,this study demonstrates the feasibility of regulation scheme,and innovatively applies siltation reducing shield into engineering design.
2016(10):57-60.
Abstract:Compared with the coastal port,vessel mooring operation in inland harbor is influenced more obviously by current.Due to the geographical environment,the current flow always occurs in the inland harbor.Vessel motion is introduced as the controlling conditions to meet the requirements of ship’s mooring operation.Then,based on the mooring simulation,various limiting conditions are analyzed,especially the limited current conditions.The limiting conditions of wave,wind speed and current under vessel motion are not mentioned in norms when the vessel moors at berth.The research results may provide theoretical reference for relevant vessel berthing operations in inland harbor.
ZHANG Zhi-ming , YANG Guo-ping , ZHANG Peng
2016(10):61-67.
Abstract:The paper studies some innovative achievements of general design of domestic sea ports in the last ten years.The key points focus on the site selection of sea ports,the classification of the general layout of port area,the scale of harbor basin,the division standard of jetty’s sheltered degree,and the major dimension about jetty elevation,water depth,and the berth length.The result reveals the newest development achievements of general design fields in our country and the leading role to the professional sciences knowledge field.
YANG Guo-ping , ZHANG Peng , ZHOU Jian
2016(10):68-74.
Abstract:Making an overview survey about the historical evolution process and the primary algorithm of depth datum in our country,the paper introduces the classification and development of the depth datum worldwide.Meanwhile,the paper gives a comparison about the calculate algorithm of jetty’s elevation between domestic and overseas code.It focuses on the calculation principle,combination factors and data analysis,and analyzes the definition and statistical approach of the design water level.This comparison research may be helpful to the application of domestic and overseas code in port projects.
YU Zhi-an , LIU Qiang , YANG Xiao-tong , GU Xiang-kui
2016(10):75-79.
Abstract:According to the engineering characteristics of Maoming Bohe new port general-purpose wharf and based on the application mechanism of the perforated caisson structure,we analyze its adaptability to this engineering,and put forward the scheme for the perforated caisson and the structural measures for realizing perforation and improving the wave-breaking effect.According to the model experiment result,we analyze the effect of the perforated caisson on wave overtopping and reflecting.The rationality of elevation of wharf apron is verified.
LI Yuan-qing , WANG An-hua , WANG Qiu-yi
2016(10):80-85.
Abstract:For all-steel tubular frame mooring structure of large offshore oil wharf,the calculated fatigue life using calculated mooring load will be short and be deviated from the actual situation.Currently there are fewer researches on the analysis of the measured mooring load,and they are disorder.This paper analyzes actual measuring mooring load of 300 000 DWT crude oil wharf expansion project in Ri-zhao port Lan-shan harbor,and finds out the probability law of distribution for mooring load and analyzes the fatigue damage of the tubular nodes.The analysis results show that the worst fatigue damage nodes are middle tube nodes,and mooring load has little influence on fatigue damage to all-steel tubular mooring pier,only 10-4 orders of magnitude.
LU Wei , REN Zeng-jin , LI Yuan-qing
2016(10):86-89.
Abstract:Large-scale oil wharves usually adopt the layout of butterfly.Generally,the critical loading relating to the overall structure stability is the wave loading.Typically,the maximum wave height and its corresponding wave period or the maximum wave period and its corresponding wave height are chosen are the design wave parameters.However,it is indicated by calculations that those are not necessarily the critical condition regarding the wave parameters.By reference to the numerical analysis result of the factor of pile group,this paper studies the change of wave loading on small-scale pier column structure with different wave heights and wave periods,and also studies the general pattern of the overall stability of separate caisson dolphin structures.
HU Jia-shun , REN Zeng-jin , WU Zhe-feng
2016(10):90-94.
Abstract:Based on the practical sea wharf structures upgrading and reforming cases,this paper classifies wharf structures into two categories depending on whether the wharf apron is advancing or not.In condition of fixing wharf apron,we present three practical reforming cases:reform of rubble bed,addition of independent structure ahead of foundation and addition of accessory structures.In condition of advancing wharf apron,two cases are presented:newly constructed structure combined with old structure or newly constructed structure independent to the old one.For the open type wharf on piles with fixed wharf apron,the cases of separated structure and combined structure are presented.
2016(10):95-99.
Abstract:The service of pile-supported wharf will be influenced by sediment deposition.In order to study the influence law of sediment deposition on piles,the following works are finished:the structures and soils are modeled by three-dimensional solid elements,contact elements are set up to consider interaction of piles and soils,the birth and death of elements are used to model the sediment deposition,and geotechnical parameters are calibrated by measured displacements.The result shows that the maximum bending moment will appear at the top of pile under additional earth pressure by sediment deposition,and the most of piles are in tension at the landside section while the worst section is at the top of piles which towards the sea.The stress condition of piles will be obviously improved and the influence of deposition will be reduced after excavating sediment.
WU Li-xin , YU Yang , LIU Shan
2016(10):100-105.
Abstract:There are many factors which decrease the throughput of the ship loading system in large coal terminal,especially in the case of continuous layout berths.The influence factors such as deballasting delays,system capacity and changing hatches,etc.are analyzed deeply and the relevant solutions are proposed.Then the reasonable matching of waiting and working berths is recommended in continuous layout berths of coal ship-loading terminal.Combined with the Huang-Hua port project and the research result,optimal layout plan of terminal has been put forward.
ZHOU Jian , SHI Ling , TANG Min
2016(10):106-109.
Abstract:According to the requirement on water level calculation stipulated in Chinese code for port engineering,the long-term & short-term real-measured water level are needed. Due to the lack of observation data for overseas projects,design water levels can not meet the requirements of Chinese Code. Based on Ain Sukhna project in Egypt,we calculate the water level of port engineering,and expound clearly the similarities and differences of calculation methods for the water level at home and abroad.
2016(10):110-113.
Abstract:The elevation of wharf surface must be determined as to avoid water runup,to ensure the safety of structure and convenience of terminal operation,as well as to save the project investment.Regarding the vagueness of calculation method,specified in the code,which determines the elevation of wharf surface with remarkable water runup caused by storm surge,a specific calculation method is proposed,based on a concrete projects with domestic and foreign codes and model tests.This method comprehensively analyzes the principle of the calculation of wharf elevation and the determination and evaluation of various parameters.It comes up with a feasible calculation method in the case of obvious water setup,in order to determine the elevation of wharf appropriately.
REN Zeng-jin , DING Wei , LI Yuan-qing
2016(10):114-117.
Abstract:In Lanshan port area of Rizhao port,four 300 000 DWT crude oil wharves are arranged successively along one line. For all large crude oil wharf groups,this kind of layout is the first try. After a decade of development and construction,two 300 000 DWT crude oil wharves have already been constructed and the third 300 000 DWT wharf(with the capacity of 450 000 DWT)is under construction.Meanwhile,the fourth one is in the stage of feasibility study. During the construction much experience has been accumulated and applied to optimize the length,the layout of breasting and mooring dolphins,the structure and the style of connection to bridge approach of subsequent wharves.The article presents the progress and principles of optimization and analyzes the advantages and disadvantages of successive layout of wharves,in order to provide a reference for the design of similar projects.
CHU Guang-qiang , MA Yan , QIU Tian-jin , CUI Yong-hong
2016(10):118-122.
Abstract:Based on the estimation of economicalness of the open stockyard and three types of covered stock yards under various cargo mean days in-storage at port and by comprehensive net present value analysis of the initial investment and 30 years’ operation cost,we analyze the adaptability of various types of stock yards from the view of economicalness.
2016(10):123-127.
Abstract:To meet the requirement of all-weather operation for 90% vessels in ro-ro wharf of Ningbo Meishan port,the elevation of wharf and approach jetty is low.Because of the large wave in the engineering area,the master load of the jetty turns to be the wave load instead of the vehicles load.To resist the uplifting,down-falling and horizontal thrusting forces from the wave,the design adopts the bi-directional-loaded prestressed girder,the front-weak & back-strong pile bents and wave load transmitting device to realize the design of pile-girder type approach jetty with low top-elevation and large wave.All indices meet the requirement of the standards.The design method and experience are summarized.
2016(10):128-132.
Abstract:Compared with the conventional caisson pier structure,a new type caisson with flange slab can effectively improve the wave reflection,decrease earth pressure behind the wall,and reduce the engineering investment.There are some practical engineering cases in comb-type breakwater while the caisson with flange slab is rarely used in vertical pier structure which has backfill in the rear.This paper introduces the application of caisson with flange slab in Dalian Songmu island general cargo pier,analyzes the effect of wave and wall backfill on comb-type pier structure,and studies the selection of flange slab caisson scale.
QIU Tian-jin , MA Yan , CHU Guang-qiang , CUI Yong-hong
2016(10):133-135.
Abstract:To meet the demands of“East coal moving to South”in Rizhao Shijiu port area,we analyze systematically the coal throughput and railway cars in Rizhao port and carry out a technical & economic comparison concerning the car dumper’s adaption to the railway cars,so as to provide a scientific basis for decision-making and support.
FANG Ai-dong , WANG Xiao-yuan , ZHAO Kai
2016(10):136-140.
Abstract:In phaseⅠ(Taicang to Nantong section)of 12.5 m deep-water channel project from Nanjing in the Yangtze River,to achieve the goal of “curbing adverse trends and improving channel conditions”,we carried out riverbed evolution analysis,mathematical model calculation and physical model test and determined the regulation scheme at last.Based on a multi-program comparison,we chose the flexible mattress,riprap embankment and component embankment as the engineering measures,and developed a new beach protection structure,i.e. the active hook, and applied it to the project.
ZHAO Kai , LUO Shao-zhen , WANG Xiao-yuan
2016(10):141-145.
Abstract:The semi-circular structures were used as part of the dam body of Baimaosha waterway regulation engineering of the Yangtze River deepwater channel phase I project.According to the actual working conditions,this paper analyzed and compared different options of dike structure types,and recommended the semi-circular structures as a selection scheme.Based on this,the force and construction of semi-circular structures were further analyzed and the results were shown and verified by practice.The practical application showed that the structures owned the feature of excellent stability,and well achieved the functional requirements of the engineering.
ZHANG Li-yuan , TANG Jian-hong
2016(10):146-151.
Abstract:Most of the rivers in the upper Yangtze River have high water head,rapid flow,large variation of water level.Serving as a navigation structure,ship lift cannot satisfy great traffic volume and lateral displacement limitation of tower column under earthquake,while traditional multistage ship lock has to deal with a series of problems:huge water consumption,poor flow regime in lower lock approach,etc.Water saving ship lock can effectively solve the problems above,however not enough experience has been gained domestically.Based on the water-saving ship lock scheme of the new channel of Three Gorges project,from the perspective of working principle of water-saving ship lock,this article sdudies structure selection,layout of water basins,structure elevation and scale are discussed in detail.Structure stability,conveyance efficiency of the scheme are analyzed,and superiority comparison to cascade ship lock scheme is expounded.
TAN Feng , WANG Lin , WU Mei-ping
2016(10):152-156.
Abstract:From the aspects of dredging volumes and soil property,spoil disposal area and sailing distance,dredging equipment,environmental strategy,dredging schedule and cost estimates,the dredging strategy and methodology for long artificial channel are analyzed based on 250 000 DWT channel design in Morebaya river of Guinea Simandou.Dredger production rate calculation method and the related key factors,dredger time and cost estimates are analyzed emphatically.The cost involves fuel cost,crew cost,depreciation cost,maintenance repair cost,general and administration cost,contingency cost,contractor’s margin and mobilization cost
TANG Ying , XUE Xiao-xiao , SHANG Jian-ping
2016(10):157-161.
Abstract:According to a practical cases of the deep channel in Guangzhou port,this paper analyzed the process of ships arriving anchorage,entering channel,operation on berth and leaving port,and built a complex channel system simulation model which considered the influence factors such as tidal,multiple branching channel control rules.Based on the port service level in condition of traffic volume forecasting and the development of ship type,the paper analyzed the throughput capacity of several broaden project schemes of deep channel in Guangzhou port which offered important support to the broaden project.
2016(10):162-168.
Abstract:The concepts and detailed design of channel width of Design Code of General Layout for Sea Ports(China),Harbor Approach Channels Design Guidelines(PIANC,2014),Spanish Recommendation for Maritime Works of Spain(Spain),New design standards for the ports and harbor (Japan)are introduced.Along with the comparisons of channel width of the one-way and two-way channel of typical container ship and VLCC by different cross flow,wind and ship speed,some useful conclusions are drawn.
YUAN He-ping , LIU Chun-ze , ZHANG Jing-shu
2016(10):169-173.
Abstract:When we determine the lock capacity,the transportation demand and the vessel development need to be taken into consideration to avoid ship lock becoming a bottleneck of the development of waterway transportation.After analyzing and predicting the increase of the throughput of Tai’erzhuang lock,the current status and the tendency of vessel dimensions,three main indicators of a lock of the design target year are acquired by computer simulation method,which are the average total tonnages of passing vessels per lockage,average number of passing vessels per lockage and occupancy rate of chamber.Those indicators can be used for calculating the capacities of the planned Tai’erzhuang third-lane lock under different chamber dimensions,and checking the capacity of the running lock at Tai’erzhuang.In the end,the reasonable or suitable chamber dimensions from different options are chosen according to the simulation results and considering conditions such as predicted throughput of lock,vessel development and water-saving when lock operating.
CHEN Yong-jian , ZHOU Jing-xiang , WANG Chao-liang
2016(10):174-176.
Abstract:Based on the Internet+ concept,from the perspective of the national requirements,public demands,and its own development needs,this paper analyzes the situation and demands faced by maritime informatization,proposes the maritime informatization development goals based on the Internet+ technology during the period of 13th Five-year Development Plan.Seven most valuable suggestions are given in the end.
WAN Hai-xia , ZHANG Wei-hong , LYU Zhao-jiang
2016(10):177-181.
Abstract:Comparing the domestic and oversea’s ports in research on the green port’s environmental protection,we find out the problems existing in the development process of China’s green ports and analyze the trend of construction of China’s bulk port’s green environmental protection system.Making full use of the information technology,dust control new technology,new energy and smart energy management system concept,we put forward the construction scheme of the green bulk cargo port’s intelligent environmental protection system.
2016(10):182-185.
Abstract:Problems in sea-rail combined transportationis analyzed.Taking Qingdao port for example,we summarize the general framework for sea-rail combined transportation application demonstration project,content of construction and achievements,and propose to adopt the Internet of Things and RFID technology to realize information inter-connection of railways,waterways and information sharing of goods,vehicles,ships,etc.,so as to improve the efficiency of the central railway station and ports and achieve the port &rail transport chain integration,and thus support the implementation of the Belt and Road strategy and promote the upgrading of ports.
XU Miao , JIN Zhao , WANG Zong-hao
2016(10):186-188.
Abstract:As CCCC’s core business system,the project management system is the most effective means of construction process monitoring management for the group headquarter.The construction of project management system marks the competent business of construction enterprise fully into the era of information control,which has laid a foundation for CCCC to achieve the strategic goal of “enlarging and strengthening to the world-class enterprise”.Combining with the existing management system,we probe into problems existed in in the application and practice of project management information system.
QIU Yu-bo , DONG Qi-qiang , FENG Sen
2016(10):189-194.
Abstract:This paper expounds the ideas of large-size enterprise cloud data center design and construction to achieve the main goals of group professional work applications,centralized data controlling,disaster recovery combining with the actual situation of China Communications Construction Company cloud data center construction.It also introduces key technology and methods used in the construction and implementation of the technical architecture design,network planning and design,as well as the construction of basic conditions In the construction of the clound data center.
LIU Xin , ZHAO Zi-jian , CHEN Bo-tong , WU Chun-hui
2016(10):195-198.
Abstract:To meet the automated container terminal operation and maintenance monitoring requirements,integrating cloud computing with big data analysis,mobile internet,networking and other new technologies,this paper constructs a coordinated operation and maintenance network management platform which is user demand-oriented,innovation-driven,intelligent,flexible and efficient.It provides equipment remote fault diagnosis,equipment health reports,equipment failure warning as well as other value-added services.It can helps equipment manufacturers to improve product quality,expand sales,extended enterprise value chain services.
2016(10):199-202.
Abstract:Based on the guidance of the“Internet+”and“Four Transportation”from the Ministry of Transport,through analyzing current transportation at home and abroad,focusing on further research of intelligent transportation top structure,we put forward the idea of sustainable intelligent overall structure,in which, the overall construction content 1+4+NX is explained and the details and connection of each application system is specified. Moreover,the above assumption has been applied to practice through intelligent construction projects in Beijing,Xi’an,Xining,etc.,the success of which could serve as a basis for the top-level development of intelligent transportation construction.