Analysis and treatment technologies for common problems in foundation piles of high-pile wharf
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the problems of over-height,under-height,deviation,cracking of pile head,and pile body cracks,as well as the integrity anomalies and insufficient bearing capacity of cast-in-place piles and embedded piles during the construction of foundation piles of high-pile wharves in port engineering,this paper proposes cutting piles,partially lowering the elevation of the upper structure,partially increasing the cross-sectional area of the upper structure,adding pile caps,splicing piles,filling piles,reinforcing with wrapping,and post-grouting treatment technologies.Through the analysis of the effect of post-grouting reinforcement measures on bearing capacity improvement in engineering examples,it provides data support for the common problem treatment technologies of cast-in-place piles and embedded piles.The research results can provide reference for the treatment of foundation piles for high-pile wharves.

    Reference
    Related
    Cited by
Get Citation

JIANG Lamei, WANG Jun. Analysis and treatment technologies for common problems in foundation piles of high-pile wharf[J]. Port & Waterway Engineering,2025(3):121-127.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 19,2025
  • Published:
Article QR Code