Applicability analysis of high-frequency hammer for reef cleaning range
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the reef clearing construction of the channel project,the impact of the construction on the adjacent buildings needs to be considered if there are adjacent buildings near the reef clearing area.To avoid the adverse impact on existing nearby buildings in the Western Land-Sea New Corridor,Pinglu Canal,channel project,the project uses the cyclic impact of a high-frequency breaker to break the rocks,which is more efficient and environmentally friendly.Aiming at the applicability of the high-frequency hammer for reef clearing in sensitive areas,a numerical simulation calculation model of the high-frequency hammer for reef clearing is established based on 3DEC,the dynamic response rules of the rock mass under high-frequency vibration impact are studied,and the range of application of the HB3600 hammer for the reef clearing construction is proposed.The results show that the HB3600 hammer is suitable for rocks with a compressive strength within 30 MPa and the rock-breaking efficiency decreases beyond this range.The stress generated inside the rock mass under the impact of the breaker gradually decreases as the distance from the hammer tip increases,the vertical stress has a greater impact within the range of 0.95 m and the lateral stress has a greater impact within the radius of 0.5 m.

    Reference
    Related
    Cited by
Get Citation

邹永胜,李启佳,王 锐,汪江军,冯国星,闵文军.高频破碎锤清礁范围适用性分析[J].水运工程,2025,(1):205-208

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 08,2025
  • Published:
Article QR Code