Application of construction technology of bank slope in complex space based on BIM simulation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the problem of construction on the bank slope in the late construction stage of an inland framed wharf on island platform,BIM technology is used to simulate construction of filling,excavation and stone throwing in the project of the comprehensive terminal in Hexi operation area of Zhangshu port area in Yichun Port,and an implementation plan is proposed that contains island excavation by partitions,collaborative operation between excavators and dredgers,stone throwing with self-dumping and string bag.Engineering practice shows that compared with the steel platform,the construction by island platform saves the total construction period by about 40 days and the construction costs by about 7 million yuan,in which the new construction technique for complex spatial bank slope can shorten the construction period by 10 days.The research results can provide reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

刘根生,计 焕,潘子煜,李烈顺,陈灿奕,危 伟,黄筱云,黄伦超.基于BIM仿真的复杂空间岸坡施工技术应用*[J].水运工程,2024,(10):194-199

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 14,2024
  • Published:
Article QR Code