Technical points and risk assessment of large caisson reuse feasibility
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the needs of upgrading,demolition and reconstruction of the gravity caisson wharf,the basic data such as the current status of caisson,the transportation path and distance,and the temporary storage site are collected,and the design of the caisson reuse scheme is carried out.Combined with the construction conditions of project example and the characteristics of LNG wharf with high design standards,six risk factors are extracted from the three major technical points of design,construction and economic,including wharf plane design,caisson detection and evaluation,caisson floating or removal risk,construction technology,engineering progress and engineering investment.By constructing the risk situation structure model,the risk factors are measured with clear quantitative indicators,which provides an important basis for recommending scheme 2,namely only the backfill material inside the caisson is used for the LNG wharf.The risk and investment of the scheme are controllable,and the construction progress is fast,which provides a stable working face for the subsequent construction of the new wharf on schedule.

    Reference
    Related
    Cited by
Get Citation

钱怡杰,唐 洲.大型沉箱利旧可行性技术要点及风险评估[J].水运工程,2024,(9):68-72

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 10,2024
  • Published:
Article QR Code