Survey and optimization strategy of pile foundation design for wharf project in Karst area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on a wharf project in Shaoguan within Karst regions,we study the problem of pile foundation design and Karst caves treatment in wharf project to achieve the aim of improving the reliability and safety of pile foundation design under complex geological conditions.By combining drilling and various geophysical detection methods(including tube wave detection and elastic wave CT methods),we carry out a comprehensive survey of geological characteristics of Karst area,and propose a treatment approach involving “layered stone filling followed by grouting” for areas with weaker physical and mechanical properties of Karst caves.The results show that the distribution of Karst caves is irregular with varying greatly in size and depth.Static load test results are validated the effectiveness of this treatment approach.

    Reference
    Related
    Cited by
Get Citation

陈振道,杨克勤,黄雯雯.岩溶地区某码头工程的勘察与桩基设计优化策略[J].水运工程,2024,(8):282-287

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 13,2024
  • Published:
Article QR Code