Abstract:The joint scheduling of ship lock groups in the river basin is used human dispatch and scheduling because of its many influencing factors and complex process,without forming an integrated intelligent scheduling system.We carry out the study on influencing factors of ship lock dispatch and scheduling strategy,abstract traditional multiple ship locks scheduling decision by human judgment into a mutual coupling problem of timetable problem and spatial bin packing problem,and give a specific scheduling algorithm process.Based on this,we design the integrated scheduling scheme for three gradients of Shuanggang,Bazizui and Jiepai ship locks in Xinjiang River Basin,and use the intelligent algorithm to automatically generate the integrated plan for multiple ship locks in the basin.The results show that this integrated scheduling system for ship lock group in the basin achieves good application results in practice,which can effectively improve the level of scheduling intelligence and increase the efficiency of navigation.