Establishment of construction control network for Pinglu Canal project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction control network of waterway engineering is an important issue in canal construction.Taking the establishment of Pinglu Canal construction control network as an example,we determine levels of horizontal control network and elevation control network based on the precision requirements of the construction layout of hub buildings.We quickly complete the field data collection of the control network by advanced measuring instruments,and use the measurement data of Guangxi continuous operating reference station(GXCORS) to centrally and uniformly process GNSS data,so as to efficiently complete the production processes of construction control network technology design,field data collection,internal data processing,accuracy analysis,and achievement provision.

    Reference
    Related
    Cited by
Get Citation

王萧寒,花 斌,黄勇清,卢军民,王家文,李建委,王俊刚.平陆运河工程施工控制网的建立[J].水运工程,2024,(4):196-201

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 12,2024
  • Published:
Article QR Code