Test of navigation and construction closure for third phase of Lize Navigation-Power Junction in Jialing River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To ensure the basic navigation function of the channel during the construction phase of Lize Navigation-Power Junction,according to the results of the 1:100 normal fixed bed physical model test for the construction diversion and closure of Lize Navigation-power Junction,we analyze the navigable flow conditions and cofferdam closure test in the third stage of construction diversion period from the perspectives of velocity,flow pattern,navigable flow and navigation route,and obtain the calculation parameters of different closure widths.The results show that the test results obtained from the proposed diversion cofferdam scheme for the third phase of construction can well solve the navigation problem during the construction period of this navigation-power junction in terms of flow velocity,flow pattern and other water conditions.

    Reference
    Related
    Cited by
Get Citation

陈 凯,倪志辉,彭小情.嘉陵江利泽航运枢纽施工期三期通航及施工截流试验[J].水运工程,2024,(3):119-125

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 11,2024
  • Published:
Article QR Code