Inquire into appropriate waiting anchorage capacity on second channel of Beijing-Hangzhou Grand Canal
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper takes the waiting anchorage of the Babao ship lock on the second channel of Beijing-Hangzhou Grand Canal as the research object.Based on previous achievements such as traffic volume prediction,analysis of navigation conditions and operational characteristics of Babao ship lock,this paper uses empirical formula and queuing model to analyze and calculate the appropriate anchorage capacity,makes an example comparison using the layout of the waiting anchorage of Sanbao ship lock,and proposes targeted transformation measures.The results show that the appropriate capacity of the waiting anchorage is no less than the number of ships in three lock times.It is recommended to set up a remote dispatch anchorage for cascade dispatch.

    Reference
    Related
    Cited by
Get Citation

马 晶,孙 波.京杭运河二通道待闸锚地容量探讨[J].水运工程,2024,(2):120-123

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 02,2024
  • Published:
Article QR Code