Construction technology of respiration-type fabricated ecological revetment under complex conditions
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Under complex conditions,such as limited transportation conditions,continuous navigation during construction,and high voltage line height limit,the new respiratory-type prefabricated ecological revetment structure construction faces technical difficulties in terms of component lifting and installation,pile sinking accuracy control,connection between piles and prefabricated bottom plate,and flatness of prefabricated bottom plate installation.This paper carries out a comparative analysis of various complex conditions and puts forward the technical measures such as the lifting process of a self-balance lifting vessel,the positioning frame process of pile planting,the pile driving process of the reserved steel bars at the pile top and steel sleeve,and the technology of the cushion construction,which can better solve the technical problems of this new structure during construction under complex conditions.

    Reference
    Related
    Cited by
Get Citation

靳付成,冯 浩,顾宽海.复杂条件下呼吸型装配式生态驳岸施工技术[J].水运工程,2023,(11):211-217

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 14,2023
  • Published:
Article QR Code