ZHA Xinyuan
Hubei Key Laboratory of Hydropower Engineering Construction and Management,China Three Gorges University,Yichang 443002,China;College of Water Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,ChinaTONG Fuguo
Hubei Key Laboratory of Hydropower Engineering Construction and Management,China Three Gorges University,Yichang 443002,China;College of Water Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,ChinaLI Biao
Hubei Key Laboratory of Hydropower Engineering Construction and Management,China Three Gorges University,Yichang 443002,China;College of Water Hydraulic and Environmental Engineering,China Three Gorges University,Yichang 443002,China查新元,童富果,李 彪.雅口航运枢纽围堰过流面局部破坏成因分析*[J].水运工程,2023,(9):216-222
Copy