    Abstract:

    Aiming at the problem that the concrete in the corridor of ship lock is easy to crack when concreting in lifts is adopted,based on the given concrete thermal parameters and boundary conditions,the simulation software Midas FEA is used to simulate the distribution of the internal temperature field of the concrete in the corridor under different concreting in lifts and water-through cooling conditions. Combined with corridor size and external constraints,the risk of concrete cracking under different concreting in lifts and different spacing between cooling pipes is evaluated. The results show that the concrete cracking risk is high when the bottom plate,side wall and roof are poured separately,and the concrete cracking risk can be greatly reduced when the bottom plate and upper side wall,top plate and lower side wall are poured as a whole. Cooling water does not significantly reduce the cracking risk of concrete under external constraint stress. On the premise that the concrete temperature field meets the temperature control requirements,it is recommended to cancel the measure of cooling water.

    Reference
    Related
    Cited by
Get Citation

李 凯,王英凝,邓春林,余志鹏,于 方.船闸廊道混凝土分层施工工艺优化及防裂分析[J].水运工程,2022,(11):232-239

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 08,2022
  • Published:
Article QR Code