Design scheme and optimization of automated terminal container yard
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The pavement structure scheme of the container yard is one of the key points in the design of the road and storage yard. According to the container yard heap of fixed-point piled up the law of the box area,and at the same time for automated requirements rail foundation of post-construction settlement amount shall be coordinated with corner foundation,the demand of corner foundation post-construction settlement is high,we propose the reasonable scheme of automated terminal container yard. Taking Qinzhou automated terminal as an example,we introduce the design essentials of container yard pavement and corner foundation,compare PHC pile foundation scheme and composite foundation scheme with different pile diameters,apply the finite element software to calculate the container corner foundation scheme in detail,compare the safety and economy of the structural scheme by item,and select the best scheme. The scheme can be used for references for the similar projects.