Key points of general layout for Phase Ⅳ project of Nansha Port Area in Guangzhou Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Phase IV project of Nansha Port Area in Guangzhou Port adopts a new technical scheme for an automated container terminal,which is greatly different from other automatic container terminals in terms of automatic operation mode,loading and unloading operations,selection of horizontal transport equipment,characteristics of collection and distribution,and land area and coastline forms. In view of these,this paper considers the automatic operation process,equipment operation characteristics and traffic organization scheme of the new technical scheme,and analyzes related factors in the general layout of various functional areas in the land area,such as the frontier operation area of the terminal,automatic container yard,maintenance and testing area,office area and gate area. Furthermore,the paper summarizes the key points of the general layout,such as the functional area composition and scale requirements of the technical route of the automated container terminal.

    Reference
    Related
    Cited by
Get Citation

黄炳林,丘耀桦.广州港南沙港区四期工程平面布置要点[J].水运工程,2022,(10):53-58

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 09,2022
  • Published:
Article QR Code