Research on influence of channel dredging on navigable flow conditions in complex bridge-group reach
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The Fujiang Bridge of Chengdu-Dazhou-Wanzhou High-Speed Railway is in the complex bridge-group reach. The left bank of the bridge is adjacent to a large wetland park,which intrudes into the navigable hole of 80 m on the left bank of the bridge for the new Dazhou-Chengdu Railway and occupies part of the navigable net width. This worsens the flow conditions in the bridge area,and the bridge area cannot meet the Class V channel standard. This study analyzes the regulation effects of four different dredging schemes by using two-dimensional mathematical flow models and ship maneuvering simulation tests. The results indicate that when Scheme 4 is employed for the large-range dredging of the wetland park on the left bank,and the old Dazhou-Chengdu Railway in the upstream is demolished,the maximum flow velocity in the bridge area is reduced by 0.46 m/s,a reduction of 21.88%,and the maximum lateral flow velocity is reduced by 0.33-0.65 m/s,a reduction of 33.67%. The optimal dredging scheme can effectively improve the navigable flow conditions of the channel in the bridge area and thus ensure navigation safety.

    Reference
    Related
    Cited by
Get Citation

CHEN Ting-ting, HU Yang, ZHOU Yu-jie, et al. Research on influence of channel dredging on navigable flow conditions in complex bridge-group reach[J]. Port & Waterway Engineering,2022(9):99-105.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 13,2022
  • Published:
Article QR Code