Treatment of leakage under cut-off wall in port engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In a port engineering project,monitoring data reveal the presence of leakage channels under the cut-off wall. Grouting under the wall has been proven highly effective against the leakage.The key technical points are summarized regarding the design and construction for the leakage treatment under the cut-off wall in the project,encompassing the anti-leakage standard,determination of the sealing range,layout of grouting holes,grouting depth,grouting sections,grouting pressure,and grouting technology.Taken together,they form a set of technology for the treatment of leakage under cut-off walls.The sealing range determination based on water level observation breaks through the traditional technology,which can provide a reference for subsequent projects.

    Reference
    Related
    Cited by
Get Citation

伍琪琳,燕继宇,王征亮.港口工程防渗墙墙下堵漏处理[J].水运工程,2022,(2):224-228

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 16,2022
  • Published:
Article QR Code