Track-type onshore piling platform construction technology
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The common pile foundation construction methods in old wharf reconstruction mainly include water construction method and land construction method.Aiming at the problems of high cost and low efficiency in water construction and high requirement of wharf structural strength in onshore construction,we propose the construction technology of onshore piling platform based on rail walking combining with the Q21 wharf reconstruction project of Ashdod Port in Israel,realize the high quality construction of steel pipe pile and sheet pile,and analyze the key parameters and calculation method by using finite element software.The results show that the structural strength and stiffness of the track type pile driving platform can meet the requirements under different working conditions. This technology can provide the references for the onshore construction of wharf pile foundation.

    Reference
    Related
    Cited by
Get Citation

吴 睿,薛 帆.轨道式陆上打桩平台施工技术[J].水运工程,2021,(11):212-217

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 09,2021
  • Published:
Article QR Code