Plan layout of a public waterway of Dalian Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The channel layout is greatly affected by topographic and geologic conditions,tidal current,and surrounding environment. Taking a public waterway project as an example and adopting tidal current and sediment mathematical model tests and ships maneuvering tests,we demonstrate on the plan layout of a channel from aspects including the natural conditions of the project area,the relationship between the project and the environmental protection zone,and the mid-long-term development planning of the port,and determine the optimal axis plan. We also discuss the design innovations when determining the channel dimensions to provide technical reference for the layout of similar long-distance channel projects with many comprehensive constraints.

    Reference
    Related
    Cited by
Get Citation

周俊青,王政川,孙志国.大连港某公共航道平面布置[J].水运工程,2021,(11):93-97

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 09,2021
  • Published:
Article QR Code