Concrete pouring technique of offshore high-pile wharf
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the difficulties in construction,weather and sea conditions,as well as construction progress and cost control during concrete pouring on water for the offshore terminal,we use small special equipment,concrete pumps,concrete pump trucks and multi-functional boats to realize a series of water and land combination of water concrete pouring process,and transfer part of the concrete pouring from traditional water boat operation to land operation in a 300,000-ton crude oil terminal project to improve the construction efficiency,reduce construction difficulties,save construction costs,and meanwhile ensure construction safety and project quality.

    Reference
    Related
    Cited by
Get Citation

汤凤春,赵洪力.离岸式高桩码头混凝土浇筑工艺[J].水运工程,2021,(10):245-247

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 12,2021
  • Published:
Article QR Code