Comparison and selection of port general layout schemes of seaport project under influence of long-period waves
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
The problem of how to make the plane layout better and reduce the influence of long-period waves through numerical simulation in the early design stage of the wharf in long-period waves sea area is studied.This paper uses the WW3 ocean wave model,MIKE21SW module,and MIKE21BW module to conduct a more comprehensive simulation of long-period waves which is verified based on the measured data. The simulation steps can be used as a general operation procedures for long-period wave simulation. To better reveal the impact of long-period waves on the ship’s response,the integrated waves are separated into short wave elements(<30 s)and longwave elements(≥30 s),and Hs<0.3 m is used as the preliminary judgment standard. It is concluded that the port general layout needs to expand the shielding range to block the main wave direction of long-period waves,and at the same time minimize the size of the entrance door to reduce the long-period wave input energy and reduce the wave height in the port.