Application of intelligent management and control in the whole process of bored pile construction
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Bored pile is one of the basic structural forms of waterway regulation engineering structures,which has the advantages of high bearing capacity,high strength and stiffness,small deformation of pile body,etc. However,as a concealed project,it has the problems of difficult construction monitoring and a low level of information management and control. Relying on the waterway regulation project of the Yangtze River Estuary of the Grand Canal,and based on the Beidou positioning technology,contact instrument combination method,resonant tuning fork sensing technology,BIM technology,and intelligent construction site platform,we apply corresponding intelligent construction equipment to realize the intelligent control of pile location measurement and placement,hole inspection,mud monitoring,concrete pouring and quality traceability in the bored pile construction. The integrated management and control platform integrates various monitoring equipment to form an intelligent monitoring mode for the whole process of cast-in-place pile construction,realize the digitalization,refinement,and intelligence of the construction and management on the site,and improve the construction quality and technical management level of engineering construction projects.