Design essentials of Sinochem Quanzhou’s 300, 000-ton island crude oil terminal
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To summarize and promote the design and construction experiences of a super large offshore island-type jetty,taking the design of the 300,000-ton-class jetty of Sinochem Quanzhou as an example,several key technical problems to be solved in the project are proposed,such as coordination of work ship berths and operation standards of large oil tankers,the structural design of the 450,000-ton terminal with large waves and large geological changes,the fixation of submarine pipelines,and fire protection water safety guarantee. By analyzing the wave geological conditions,optimizing the layout of the wharf,calculating the load,and innovating the structure,the above problems have been effectively solved.

    Reference
    Related
    Cited by
Get Citation

杨克勤.中化泉州30万吨级岛式原油码头设计要点[J].水运工程,2021,(3):92-97

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 09,2021
  • Published:
Article QR Code