Planning of highway collecting and distributing of Taipingwan port area of Dalian Port
DOI:
CSTR:
Author:
Affiliation:
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Aiming at the planning of the highway collecting and distributing system of Taipingwan port area of Dalian Port,according to the idea of separation of passenger and freight and in view of the intensive development,we establish the collecting and distributing pattern of “3 Transverse and 3 Longitudinal” mostly in 3 dredging port highways,use the combination of qualitative and quantitative method,four stages predicted method,OD matrix method to analyze the future port freight needs,and obtain the planning and construction scheme of collecting and distributing. The results show that the port area’s freight volume includes the coastal economic zone and hinterland of the port area in the future,and the staged development model that Yongning Street progressively transform into affording all of the passenger transport tasks from the near to the distant. The planning and construction scheme is that 3 dredging port highways become the bi-directional and six lines highway at least,Yongning Street can also become the bi-directional and eight lines highway,and the highway port is planned between Yongning Street and the first distributing port.