Study on navigation during construction period of Yakou hydro-junction in Hanjiang River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Yakou hydro-junction in Hanjiang River is navigable river junction.The navigation problem should be properly dealt with during the construction period.We propose corresponding navigation scheme combined with phased construction scheme, adopt the narrow channel in the first construction period so as to avoid the adverse effects caused by the broken navigation, and use the established lock in the second period to realize the combination of temporary navigation and permanent building.In view of the navigable flow conditions during the construction period, we establish a two-dimensional hydrodynamic numerical model to calculate and analyze the flow pattern under various flow conditions.The results show that the navigable flow conditions of two construction periods satisfy the related requirements.

    Reference
    Related
    Cited by
Get Citation

张信伟,孙保虎,胡峰军,罗亮明,白国文.汉江雅口航运枢纽工程施工期通航研究[J].水运工程,2020,(12):155-160

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 14,2020
  • Published:
Article QR Code