Application of BIM technology in Yangshan Phase IV wharf project
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    Aiming at the problems of large project volume,difficult construction and large engineering error during construction of high-piled wharf,this paper carries out a research on the application of BIM technology to the construction of hydraulic docks. The application of BIM technology to the construction visualization,collision inspection,engineering quantity calculation,and construction organization design achieves remarkable effect in the construction quality,schedule and cost control of the high-piled wharf project. It may serve as reference for the practical application of BIM technology to the construction of the high-piled wharfs hydraulic engineering.

    Reference
    Related
    Cited by
Get Citation

胡 令. BIM技术在洋山四期水工码头中的应用[J].水运工程,2020,(11):151-154

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: November 10,2020
Article QR Code