Improvement measures of navigational flow condition in downstream channel of Dafutan ship lock
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Dafutan ship lock is located at the bank of Jiangxinzhou in the bifurcated reach. In view of the problem that the gate area of the downstream approach channel of the lock has a large oblique flow and return flow,and the confluence area of the two branches at the tail of the lock has a large oblique flow,so ships’ safe navigation can not be guaranteed,we put forward improvement measures,and all regulation schemes are verified by adopting the 180 normal overall hydraulic physical model. The results show that the recommended measures of prolonging the length of the downstream navigation wall of the lock and constructing a new downstream dam can effectively improve the navigation flow conditions of the downstream lock.

    Reference
    Related
    Cited by
Get Citation

王 能,张爱平,普晓刚.大洑潭已建船闸下游航道通航水流条件改善措施研究[J].水运工程,2020,(10):143-148

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 10,2020
  • Published:
Article QR Code