Analysis of effect on docking and locking system of the Three Gorges ship lift while ships entering and leaving the chamber
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Ship lift is one of the two navigation structures of the Three Gorges project,which mainly provides fast passage for ships. While ships entering and leaving the ship chamber,the longitudinal overturn moment caused by the change of the fluctuation of the water surface will be undertaken by the docking and locking system. If the change exceeds the load limitation of the docking and locking system,it may threat the docking safety of the ship chamber. A physical model scaled 1∶12 of TGP ship lift chamber and navigation channel is established. Through hydraulic model experiment of 3 500 t bulk cargo ships entering and leaving the chamber,the relationships among ship draught,ship speed,water surface fluctuation and the force on the docking and locking system are analyzed. In order to protect the docking and locking system,it is suggested that the maxium draught of 3 500 t bulk cargo ship is no more than 2.70 m when its speed of passing through ship chamber is 0.5 m/s.

    Reference
    Related
    Cited by
Get Citation

郭 超,李中华,胡亚安.船舶进出船厢对三峡升船机对接锁定机构受力的影响分析*[J].水运工程,2020,(9):1-5

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 02,2020
  • Published:
Article QR Code