Analysis of design lowest navigable water level of Linhuaigang second ship lock
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction and operation of the hub will affect the formation of physical conditions in the process of water level,and lead to the inconsistency of the statistical samples of the design lowest navigable water level.However,rejecting the water level sequence before damage will lead to the lack of representativeness of the statistical samples.Taking Linhuaigang second ship lock as an example,we aim at the inconsistency of water level samples caused by the construction and operation of the junction and the impoundment in dry season,comprehensively consider the variation trend of upstream water,the influence of human factors on water level,the short-term and long-term operation plans and the actual situation of the project,determine the typical data of calculating the design lowest navigable water level,and obtain the design lowest navigable water levels above and below the gate.The results show that,the design lowest navigable water levels above and below the gate are 19.27 m and 17.14 m,which are calculated by the data from 2007 to 2018.

    Reference
    Related
    Cited by
Get Citation

徐军辉,王 平,刘长波.临淮岗复线船闸设计最低通航水位分析[J].水运工程,2020,(6):137-141

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 08,2020
  • Published:
Article QR Code