Large caisson air bag’s jacking and transportation construction technology
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the problem of large caisson volume,overweight weight and precast caisson pedestal in an ore wharf,the traditional method of using air bag to jack up at one time can not be adopted.By adopting a new method of jacking up at the same time,the problem of insufficient air bag jacking and inability to jack up large and overweight caisson is solved.The results show that by adjusting the aeration pressure of the air bag at the bottom of the caisson,alternate jacking up of the caisson before and after can be achieved.By this method,the air bag need not to be in the state of super-high pressure,and it can meet the filling pressure requirements of the air bag relatively quickly.It can be used as reference for the large-scale caisson construction.

    Reference
    Related
    Cited by
Get Citation

赵宪良,李超超,赵海丰.大型沉箱气囊顶升及出运施工技术[J].水运工程,2019,(5):209-212

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 15,2019
  • Published:
Article QR Code