Overall layout plan of Dayuandu second-line ship lock
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    In order to solve the constraints of existing hub buildings on the expansion of second-line ship locks under complex terrain conditions in hilly areas,this paper analyzes theoretically the design conditions,and proposes the overall layout plan of the ship lock suitable for the curved section and the technical measures to ensure the navigation capacity,which is verified by the physical model.The overall layout plan of the ship lock and related technical measures can provide reference for the construction of the second-line ship lock in the Xiangjiang River.

    Reference
    Related
    Cited by
Get Citation

ZHOU Can, DUAN Yuan-zhen, PENG Zhe, et al. Overall layout plan of Dayuandu second-line ship lock[J]. Port & Waterway Engineering,2019(3):39-42

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: March 12,2019
Article QR Code