Forming mechanism of dredged clay ball
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the problem that the clay balls formed by dredgers during the construction of certain clay formations are likely to cause blockage of transportation pipeline,we study mechanism of clay pilling.By means of the indoor crash tests and restoring forming conditions,we propose two hypotheses that the clay and sand are bonded into the ball and the block clay is worn into the ball.By studying the characteristics of on-site construction conditions,geological conditions and characteristics of clay balls when clay balls are formed to block the pump,it is found that the hypothesis of wearing into the ball from block clay is more in line with the actual situation on site.In order to reduce the probability of clay balls blockage,we propose a series of construction measures to avoid the blocking of clay balls.

    Reference
    Related
    Cited by
Get Citation

徐继涛,尹崧宇,张更生,贾志远.疏浚黏土球成形机理[J].水运工程,2018,(S1):70-74

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2018
  • Published:
Article QR Code