Characteristics of soil layers in difficult excavation area in phaseⅡdredging projcet of the 300,000 tons waterway in Lianyungang Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the construction of the LYG-302-H1.1 section of the phase Ⅱdredging projcet of the 300,000 tons waterway in Lianyungang Port,pipe clogging frequently occurs in cutter-suction dredgers,which seriously affects the construction efficiency.To avoid the frequent occurrence of this accident,we analyze the characteristics of soil layers and the reasons of pipe clogging by collating the soil data in the accident prone area,and summarize the soil quality index of such difficult excavation areas.The results show that the soil layer in this kind of area is not uniformly distributed.The clay layer contains clayey silt and sandy silt at the same elevation,and exists some calcareous cementation in the clay layer.The number of standard penetration is greater than 20.

    Reference
    Related
    Cited by
Get Citation

尹崧宇,徐继涛,张更生.连云港港30万吨级航道二期工程难挖地段的土层特性[J].水运工程,2018,(S1):58-61

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2018
  • Published:
Article QR Code