Flatness control of dredger fill area in dredging engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the problems of poor soil conditions and high flatness requirements in the dredger filling engineering,the flatness control was studied.Through the on-site measurement of elevation and the review of the slope ratio of the dredger filling area,and the calculation method of earthwork balance,the spacing of the trunk line layout and the layout of the pipeline interface were determined.After the completion of the project,it is shown that in the medium coarse sand dredger filling engineering,the method of arranging branch pipe spacing of 40 m and controlling the elevation and progress according to the bottom elevation,can effectively shorten the mechanical leveling time of the dredger filling area and save the cost about 473,000 yuan.

    Reference
    Related
    Cited by
Get Citation

张全胜,袁宝来.疏浚工程吹填区平整度控制[J].水运工程,2018,(S1):54-57

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 12,2018
  • Published:
Article QR Code