Calculation of large diameter rock-socketed pile rock-socketed depth
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    At present,the calculation results of large diameter rock-socketed pile rock-socketed depth are deviated greatly.Based on the test results of large diameter rock-socketed pile in Shulanghu mine transfer wharf,the results are compared with the various formulas.It is concluded that the embedded depth of rock-socketed depth is relatively large,and the rock-socketed depth calculated by ZHANG You-ling method is in accord with the actual situation.It is recommended to calculate large diameter rock-socketed pile rock-socketed depth by Zhang You-ling method and give the calculation formula.

    Reference
    Related
    Cited by
Get Citation

杨荣君,王世军,周 元.大直径嵌岩桩嵌岩深度计算[J].水运工程,2018,(6):247-251

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 11,2018
  • Published:
Article QR Code