General layout of 9# and 10# bulk terminal in Luoyu pier of Meizhou Bay Port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of the great scale and long construction period in Luoyu work zone,in order to ensure the operation of 9# and 10# bulk terminals,and to reduce the impact of the port that have been built,based on the construction conditions,stage construction and demands of construction,we take measures including determining reasonably terminal function handling technology and layout of the yard and auxiliary facilities,etc.,and reach the targeted goal of the reasonable function layout,high land utilization.

    Reference
    Related
    Cited by
Get Citation

周 跃,黄黎辉.湄洲湾港罗屿9#、10#散货泊位总体布置[J].水运工程,2018,(6):98-102

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 11,2018
  • Published:
Article QR Code