Waters layout of Majishan ore terminal phase Ⅲ project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This project is located in open sea area,and the tidal current is strong and varies in horizontal and vertical directions significantly,which is dangerous for wharf construction and operation.It is the key technology of water area layout for how to lead the flow in order to satisfy the safety criteria for navigating,berthing and departing.By further study on natural conditions,and combined with the current model,we propose an original program of layout,which unites the diversion facilities and hydraulic structure.The results show that the layout functions are well,which can fundamentally solve the department of dock berthing of phase Ⅲ project,and provide some reference for shoreline development and construction under similar sea conditions.

    Reference
    Related
    Cited by
Get Citation

叶宇旻,浦伟庆,于传见.马迹山矿石码头三期工程水域平面布置[J].水运工程,2018,(6):87-92

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 11,2018
  • Published:
Article QR Code