Main design points of underwater buried flexible intake and outfall pipes
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For intake and outfall pipe lines project such as that of once-through sea water circulation of large-scale power plant,it is relatively difficult to design and implement the works under water,however there is no specific technical code for this aspect by now.Aiming at questions such as different characters of above or under water works,parameter sensitivity,and reaction modulus of the natural compacted backfill material,comparative studies are carried out and verifications are made by actual pipe tests on site and material tests in laboratory.Key design points and parameters are recommended.

    Reference
    Related
    Cited by
Get Citation

邱兆山,靳付成,刘 帆,陈亚峰.水下埋设柔性取排水管设计要点[J].水运工程,2018,(6):74-77

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 11,2018
  • Published:
Article QR Code