Influence of water intake project on flow condition and sediment siltation in port area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the influence of water intake project on water flow and sediment in the harbor basin,taking Huanghua Port harbor water project as an example,we apply the method of three-dimensional mathematical model based on the analysis of regional engineering natural conditions and sediment conditions on the tidal current and sediment,and analyze the point of view of the various water solution siltation effect on flow conditions and sediment basin.The results show that after the water intake project is implemented,the flow speed in the whole harbor is not large,and the flow velocity is below 0.1 m?s except the intake port.The water intake project is not cause the change of the mud pit in the surrounding waters,and has little effect on the siltation of the inlet channel and the harbor basin.After the water intake project is implemented,the normal operation of the port will not have an influence on the design of the maximum water discharge range.

    Reference
    Related
    Cited by
Get Citation

陈淑青.取水工程对港内水流条件及泥沙回淤的影响[J].水运工程,2018,(1):93-99

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 15,2018
  • Published:
Article QR Code