Calculation of front-sheet pile and high pile wharf structure
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the case of a front-sheet pile and high pile wharf structure project,we apply high pile pier calculation software to establish simplified model,and use the FEM software ANSYS to set up a 3D model to calculate the force and deformation of front-sheet pile and high pile wharf structure in two situations.The results show that,the calculation result of finite element model is more consistent with the actual force situation than the simplify calculation.

    Reference
    Related
    Cited by
Get Citation

沈迪,葛晓丹.前板桩高桩承台码头结构计算[J].水运工程,2018,(1):69-71

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 15,2018
  • Published:
Article QR Code