Dust control scheme in reclamation area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the process of land reclamation construction,the site equipment and external force produce a large amount of dust.To counter the contradiction of the environmental protection and economic development,we probe into the construction scheme for the dust prevention and control in the loading period of large-area reclamation based on the Xiamen Dadeng and Xiaodeng reclamation and soil treatment project.

    Reference
    Related
    Cited by
Get Citation

丁洋洋,陈学忠.填海造地施工中造地区扬尘治理方案[J].水运工程,2017,(S2):97-100

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2017
  • Published:
Article QR Code